الأسئلة الشائعة
Straight answers, by the topic.
Cost, programme, payment, freight, certification, installation and regional delivery — the practical questions that shape an international facade project before drawings are approved.
01
Cost & budget
ما تكلفة الواجهة عادةً؟
Project value depends on facade area, system, glass specification, performance criteria, market and delivery scope. Residential and shopfront ranges can provide an early reference, while public, cultural, commercial and high rise packages are assessed from drawings and programme; Starveil does not apply a seven storey or US$3 million capability ceiling. See our full 2026 price guide.
ما الذي يحرك الأسعار أكثر؟
Area, glass build up (triple glazing, laminates, solar coatings), finish (anodising vs. powder coat), geometry complexity, and storey count — which drives installation method more than material.
هل ستحددون سعرًا ثابتًا؟
نعم. بمجرد حصولنا على الرسومات أو صور الموقع الواضحة، يتم تحديد السعر المحدد لنطاق العمل المذكور، مع ذكر الواجهات والاختصاصات كتابةً. وفي حال عدم ذكر خط في السعر، فإننا نوضح ذلك كتابةً.
02
Lead times & programme
كم من الوقت من الموافقة على الرسومات إلى التسليم؟
Typically 14–20 weeks from shop drawing approval to exworks, then two to six weeks of ocean transit depending on destination. A full phase by phase timeline is in From Drawings to Container.
ما الذي عادةً يؤخر المشاريع؟
في الترتيب: زمن تأخير الموافقة، وتغييرات التصميم المتأخرة، وبدء إجراءات الجمارك بعد الشحن، واستعداد الموقع (عدم التحقق من الإدماجات والعوارض قبل وصول الحاوية). في الغالب، لا يكون المشكلة في التصنيع نفسه.
هل يمكنك ضغط البرنامج؟
نعم — تتنافس كاسيتات الجدران الزجاجية الموحدة في كفاءتها في مجال سرعة التركيب، وتضمن حاويات التجميع المنسقة إبقاء المواقع خالية من الأتربة. أخبرنا بتاريخ المهم فعلاً (تاريخ الرافعة، وتاريخ الحاوية، وتاريخ الافتتاح الكبير)، ثم نقوم بالتخطيط وفقاً لذلك.
03
Payment
ما هي هيكلة الدفع؟
A staged schedule typical of export manufacturing: deposit with order, milestone payments at engineering approval and fabrication start, balance before shipment. The schedule is stated in the quotation — no surprises mid project.
ما هي العملات والشروط التي تقبلونها؟
العملة القياسية هي الدولار الأمريكي؛ يمكن ترتيب العملات الأخرى مثل اليورو والدرهم الإماراتي. نقوم بتقديم أسعار FOB وCIF حسب تفضيلاتكم، وتُذكر الأسعار أسماء شروط التوريد (Incoterms) بشكل صريح.
04
Shipping & customs
كيف يتم تعبئة الواجهة؟
تُحزم الحاويات حسب ترتيب البناء — خزانًا تلو الآخر، مستوى تلو المستوى — لذا لا يحتاج طاقمك إلى البحث عن اللوحة التالية. كل حاوية تحمل قائمة تفاصيل التعبئة الكاملة وفقًا لجدول اللوحات.
من هو المسؤول عن الجمارك؟
نحن نعد مجموعة وثائق التصدير؛ ويقوم وسيط التخليص الجمركي الخاص بك بتجهيز عملية التخليص الجمركي للواردات. ويمكننا توفير وكلاء ذوي الخبرة في معظم أسواق الوجهة بناءً على الطلب.
ماذا لو وصلت البضاعة مع تلفيات؟
Unpack and condition check within 48 hours of arrival — our packing is designed for it. Transit damage discovered early keeps any claim simple, and our packing strategy includes documented spares so a single gasket never stops a crew.
05
Remote delivery & communication
كيف تعمل دعم الهندسة عن بُعد؟
يتم الرد على الأسئلة الفنية في غضون يوم عمل واحد من قبل مهندس اطلع على رسوماتك — وليس من خلال موظف مبيعات يقرأ من كتالوج. يتم تسجيل كل رد، لذا يوضح ملف التسليم كل التفاصيل.
هل يمكننا إجراء فحص قبل الشحن؟
Yes — video inspections of mock ups and first completed panels are standard, and your representative is welcome at the plant. Panels are numbered, recorded and photographed before they leave.
ماذا عن مناطق التوقيت؟
Our engineering desk overlaps business hours across Australasia, Southeast Asia, the Gulf, and European and North American mornings. The one working day answer commitment applies regardless of your time zone.
06
Certifications & compliance
ما هي المعايير والأدلة الاختبارية التي يمكنك دعمها؟
We map the proposed configuration to the relevant test and engineering framework for the destination market. That may include EN curtain wall evidence, ASTM air and water test families, AAMA field testing procedures or other project specific requirements. The quotation states what applies and what still requires local review. Start with our Certification & Compliance evidence path, then read Certifications That Matter for the detailed explainer.
هل تغطي التقارير تكويناتي؟
The quotation states exactly which tested build up applies to your glazing, spans and wind loads. If your configuration differs from an existing test, we say so and test or engineer accordingly.
من هو المسؤول عن الموافقات المحلية؟
The quotation states which approvals are included and which sit with your local team — project specific engineering sign off by a locally licensed engineer is a common client side line, and we support the process with full documentation.
For the complete evidence path, regional reference matrix and scope boundary, see الاعتماد والامتثال.
07
Installation options
هل تقومون بالتثبيت؟
We offer three levels. T1 — your crew installs with our manuals and remote engineering (standard). T2 — your crew installs with our supervising engineer on site for the critical first weeks (weekly rate add on). T3 — our own or partner crews install to completion, assessed case by case. Full comparison in Installation Options.
لم يسبق لفرق العمل الخاصة بي أن نصبوا جدار نافذة. هل هذا مشكلة؟
ليس عادةً. تُصاغ حزم التثبيت الخاصة بنا لتلك الحالة بالضبط، وتعمل معظم الفرق المشاركة في مشاريع T2 بشكل مستقل بعد مرحلة أولية أو أسبوع أول خاضعين للإشراف. يتم إطلاق أنظمة Frameless بمستوى أول خاضع للإشراف كإجراء معمول به.
ما الذي يفعله المهندس المسؤول عن المشروع فعلاً؟
Setting out verification, crew training on the first panels, sealant audits, and a photographed inspection record at handover. Supervision is scoped in writing before it starts — support without takeover.
When would you recommend your own installation (T3)?
Projects remote from any qualified installer, and markets where we hold established installation partners. If your local market has strong glaziers, we will usually tell you T1 or T2 serves you better.
08
Middle East & North America
Can you support projects in the GCC?
Yes. For UAE, Saudi Arabia, Qatar, Bahrain, Oman and Kuwait enquiries, the technical review considers solar exposure, coastal or inland conditions, dust, finish durability, privacy and the local approval route. See our دعم مشاريع دول الخليج page.
How do coastal salt and inland dust change the specification?
They affect coating systems, fastener grades, gasket and sealant selection, drainage paths and maintenance access. The correct response is project specific, so we ask for the city, distance from the coast, exposure and cleaning strategy before fixing the build up.
Can you coordinate a North American facade package?
Yes. The design supply package can be developed around the project’s specified ASTM and AAMA testing requirements, wind criteria, thermal and condensation targets, shipping sequence and installation plan. Local code approval and professional sign off remain with the appointed local team.
Is an on site Starveil engineer included?
Not by default. T2 site supervision is a separately priced option for qualified projects, while T3 installation is assessed case by case. Supply only projects include the agreed installation documentation and remote engineering support.
Do you offer Mashrabiya, BIPV and luminous facade systems?
Yes. These sit within our specialty systems range and are coordinated with the primary curtain wall grid. The system pages explain when each approach is appropriate and what must be resolved during design.
A question we didn’t answer?
Include the project location and exposure condition in your enquiry so the answer reflects the correct climate and approval context.