{"id":1440,"date":"2026-11-13T00:43:54","date_gmt":"2026-11-13T00:43:54","guid":{"rendered":"https:\/\/www.starveilfacade.com\/?post_type=insight&#038;p=1440"},"modified":"2026-11-20T01:24:01","modified_gmt":"2026-11-20T01:24:01","slug":"curtain-wall-system-guide","status":"publish","type":"insight","link":"https:\/\/www.starveilfacade.com\/ar\/insights\/curtain-wall-system-guide\/","title":{"rendered":"Curtain Wall System Guide: Profiles, Glass, Sealants, Hardware and Drainage"},"content":{"rendered":"<div class=\"wp-block-group insight-answer is-layout-flow wp-block-group-is-layout-flow\">\n<h2 class=\"wp-block-heading\"><strong>A curtain wall is not a product. It is five materials agreeing to behave as one wall for thirty years<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A curtain wall system is five elements engineered to work together: aluminium profiles that carry the loads, glass that weathers the climate, sealants and gaskets that keep water and air out, hardware and anchors that tie everything to the structure, and a drainage design that manages the water that gets in. Buyers get into trouble by specifying the elements separately: premium glass in a weak frame, or a strong frame behind a drainage detail nobody tested. The envelope is only as good as its least considered element, which is why the selection sequence at the end of this guide starts with exposure and ends with test evidence. Starveil Facade designs and fabricates complete systems from its Foshan plant, and the delivered 40-storey tower below shows the five elements holding together at scale.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A curtain wall system is a non-structural outer envelope whose curtain wall system components are engineered as one tested assembly rather than bought as separate materials. The frame, infill, seals, fixings and drainage share one load path, one movement allowance and one warranty, and performance is verified as an assembly under standards such as the <a href=\"https:\/\/www.cwct.co.uk\/\" target=\"_blank\" rel=\"noopener\">CWCT Standard for systemised building envelopes<\/a>. For the wider family of glazed envelope routes that sit around this definition, our <a href=\"\/ar\/insights\/curtain-glazing-systems\/\">curtain glazing systems overview<\/a> maps the territory.<\/p>\n<\/div>\n\n\n\n<h2 id=\"section-2\" class=\"wp-block-heading\"><strong>Five elements, and the one question each must answer<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-table insight-decision-table\"><table><thead><tr><th class=\"has-text-align-center\" data-align=\"center\" scope=\"col\"><strong>Element<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>\u0627\u0644\u0645\u0648\u0627\u0635\u0641\u0629 \u0627\u0644\u0646\u0645\u0648\u0630\u062c\u064a\u0629<\/strong><\/th><th class=\"has-text-align-center\" data-align=\"center\"><strong>The question it must answer<\/strong><\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong>Aluminium profiles<\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">6063 or 6061 alloy, thermal break 24 to 34 mm, powder or PVDF finish<\/td><td class=\"has-text-align-center\" data-align=\"center\">Can the section carry wind and glass weight at this span?<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong>Glass<\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">Insulated units, 6+12A+6 upward, low-E coating, heat-treated where required<\/td><td class=\"has-text-align-center\" data-align=\"center\">Does it meet U-value, solar and safety targets at this exposure?<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong>Sealants and gaskets<\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">Structural silicone where bonded, weather silicone outside, EPDM gaskets inside<\/td><td class=\"has-text-align-center\" data-align=\"center\">Will the seals move with the building for 30 years?<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong><strong><strong><strong><strong><strong><strong><strong><strong>Hardware and anchors<\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">Stainless or hot-dip galvanised brackets, three-axis adjustment<\/td><td class=\"has-text-align-center\" data-align=\"center\">Can it absorb the structure&#8217;s real tolerances and drift?<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong><strong><strong><strong><strong><strong><strong><strong><strong>Drainage<\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">Pressure-equalised rebates, compartmented zones, engineered weeps<\/td><td class=\"has-text-align-center\" data-align=\"center\">Where does the water that gets in go next?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Read the table as a chain, not a shopping list. A curtain wall system fails where one element was specified without asking the next element what it needed, which is why the body sections below take each element in turn before the selection sequence puts them back together.<\/p>\n\n\n\n<h2 id=\"section-3\" class=\"wp-block-heading\"><strong>Element one: the aluminium frame<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Profiles are where a curtain wall system spends most of its metal and most of its engineering. Structural sections are extruded in 6063 or 6061 alloy, with wall thickness and moment of inertia sized to the span and wind load rather than copied from a catalogue. Thermal breaks of 24 to 34 mm separate interior from exterior metal, and the finish, powder coat or PVDF, is chosen against the climate&#8217;s UV and salt exposure. <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.starveilfacade.com\/wp-content\/uploads\/2026\/11\/02-aluminium-profile-extrusion-dies-1024x576.webp\" alt=\"Aluminium curtain wall profiles fresh from extrusion with visible die lines and thermal break cavities\" class=\"wp-image-1443\" srcset=\"https:\/\/www.starveilfacade.com\/wp-content\/uploads\/2026\/11\/02-aluminium-profile-extrusion-dies-1024x576.webp 1024w, https:\/\/www.starveilfacade.com\/wp-content\/uploads\/2026\/11\/02-aluminium-profile-extrusion-dies-300x169.webp 300w, https:\/\/www.starveilfacade.com\/wp-content\/uploads\/2026\/11\/02-aluminium-profile-extrusion-dies-768x432.webp 768w, https:\/\/www.starveilfacade.com\/wp-content\/uploads\/2026\/11\/02-aluminium-profile-extrusion-dies-18x10.webp 18w, https:\/\/www.starveilfacade.com\/wp-content\/uploads\/2026\/11\/02-aluminium-profile-extrusion-dies.webp 1536w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">On bespoke sections, dies are cut by partner die makers we have run with for years, and every die is proven against a first-article measurement before production. What buyers should demand is traceability: mill certificates per alloy batch, coating certificates per colour batch, and dimensional reports on the sections themselves. A frame that cannot show those three documents is not yet a system; it is a pile of metal.<\/p>\n\n\n\n<h2 id=\"section-4\" class=\"wp-block-heading\">Element two: the glass build-up<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Glass is the element buyers over-specify and under-check. The working variables are thickness, heat treatment, coating and cavity. A conditioned commercial envelope typically starts at a 6+12A+6 insulated unit with a soft-coat low-E surface, landing near U 1.6 to 1.8 W\/(m\u00b2\u00b7K), and double-silver or triple-silver coatings tune solar gain for hot climates without darkening the view. Heat strengthening or full tempering is a safety and thermal-stress decision, not an upgrade. The under-checked part is weight and edge quality: a large unit can weigh 60 kg per square metre, and its edge seals live inside the frame&#8217;s rebate, so glass and frame must be calculated together. Specify the glass against the exposure report, then make the supplier prove the frame can carry it.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Elements three and four: seals and hardware<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Seals fail quietly and hardware fails loudly, and both failures start at specification. Weather seals need a movement class matched to the joint&#8217;s real cycling, not the cheapest silicone on the quote. Structural silicone, where the glass is bonded, demands a factory bonding regime with adhesion tests per batch, because site bonding on a large area cannot hold that discipline. Gaskets do the dry work: EPDM lines compressed between frame and glass, with vulcanised corners where the geometry turns. <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.starveilfacade.com\/wp-content\/uploads\/2026\/11\/03-cassette-seal-gasket-stack-1024x576.webp\" alt=\"\tUnitized cassette corner showing three EPDM gasket lines, structural silicone and stainless bracket fixing\" class=\"wp-image-1444\" srcset=\"https:\/\/www.starveilfacade.com\/wp-content\/uploads\/2026\/11\/03-cassette-seal-gasket-stack-1024x576.webp 1024w, https:\/\/www.starveilfacade.com\/wp-content\/uploads\/2026\/11\/03-cassette-seal-gasket-stack-300x169.webp 300w, https:\/\/www.starveilfacade.com\/wp-content\/uploads\/2026\/11\/03-cassette-seal-gasket-stack-768x432.webp 768w, https:\/\/www.starveilfacade.com\/wp-content\/uploads\/2026\/11\/03-cassette-seal-gasket-stack-1536x864.webp 1536w, https:\/\/www.starveilfacade.com\/wp-content\/uploads\/2026\/11\/03-cassette-seal-gasket-stack-18x10.webp 18w, https:\/\/www.starveilfacade.com\/wp-content\/uploads\/2026\/11\/03-cassette-seal-gasket-stack.webp 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Hardware and anchors carry the whole assembly back to concrete that was never poured perfectly. Brackets with three-axis adjustment absorb the tolerance chain, stainless grades are chosen against the chloride exposure, and every fixing is a calculated item rather than a habit. These two elements are where a cheap quotation hides its shortcuts, so ask for the sealant&#8217;s movement class and the anchor&#8217;s adjustment range in writing.<\/p>\n\n\n\n<h2 id=\"section-5\" class=\"wp-block-heading\">Element five: drainage<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Every curtain wall system lets some water past its first line of defence. Drainage design decides what happens next. Pressure-equalised rebates vent the cavity behind the outer seal to outside pressure, so wind cannot push water uphill into the building. Compartmentation divides the cavity into zones, so a leak at floor 30 cannot travel to floor 3. Weep paths are sized and positioned to clear the water before it finds a weakness. Water performance is then verified on a test rig under methods such as <a href=\"https:\/\/www.astm.org\/\" target=\"_blank\" rel=\"noopener\">ASTM E331<\/a>, at pressure differentials matched to the project&#8217;s exposure. When a supplier says their system never leaks, ask to see the drainage drawing instead. The systems that stay dry are the ones that planned to get wet.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The five elements on one delivered tower<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"\/ar\/projects\/foshan-tianyue-apartment\/\">delivered Foshan Tianyue Mixed-Use Tower, an 18,000 m\u00b2 unitized envelope on a 40-storey development in Foshan&#8217;s Qiandeng Lake CBD<\/a>, shows the elements holding together at scale. Profiles were extruded in 6063 and 6061 alloys on the Starveil Facade 1,800 t press and two 1,000 t presses, with the unit grid set out against a pre-fabrication slab tolerance survey. Glass ran to whole-building U-values of 2.0 W\/(m\u00b2\u00b7K) for the curtain wall and 1.6 W\/(m\u00b2\u00b7K) for the hotel&#8217;s premium zones, on double-silver and triple-silver low-E units. A three-seal EPDM perimeter delivered verified acoustic performance of Rw 35 to 45 dB, brackets carried three-axis adjustment, and every cassette was numbered and traceable to its material certificates. Design, fabrication and export supply closed in 32 weeks ex-works. That is what a curtain wall system looks like when all five elements are engineered by one quality system: the panel installed on floor 34 matched the first article tested before production.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Curtain wall system design basics: the selection sequence<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Curtain wall system design basics reduce to five steps in a fixed order. First, fix the exposure: wind zone, driving rain, salt, temperature swing. Second, fix the performance targets: U-value, solar gain, acoustics, safety class. Third, choose the construction route, because the main types of curtain wall systems, stick, unitized and window wall, differ in where their quality is made; our <a href=\"\/ar\/insights\/stick-vs-unitized\/\">stick versus unitized comparison<\/a> runs that decision, and the <a href=\"\/ar\/insights\/high-rise-curtain-wall-decisions\/\">high-rise decisions hub<\/a> places it on a tower programme. Fourth, engineer the five elements in this guide against steps one and two, and test them on a performance mock-up, as our note on <a href=\"\/ar\/insights\/facade-mock-up-what-to-test\/\">what a facade mock-up should test<\/a> explains. Fifth, lock the warranty structure before the price. Buyers pricing the site-assembled route can see what a complete scope includes on our <a href=\"\/ar\/systems\/stick-curtain-wall\/\">stick curtain wall product page<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">SExposure first, drawings second<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Send the project location and exposure data, the architectural elevations, the performance targets you must hit, and any local code requirements. From those inputs the Starveil Facade engineering desk returns a system recommendation with the five elements specified line by line, the test evidence behind them, and the warranty structure the price includes. Concept-stage drawings are enough to start.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What to carry forward<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Five elements with one load path and one warranty, not five separate purchases.<\/li>\n\n\n\n<li>Traceability is the test: mill certificates, coating certificates and dimensional reports, or it is not yet a system.<\/li>\n\n\n\n<li>Glass and frame are one calculation; weight and edge quality bind them together.<\/li>\n\n\n\n<li>Drainage design assumes water gets in, and plans where it goes. That plan is what the test rig verifies.<\/li>\n\n\n\n<li>Select in order: exposure, performance targets, construction route, element engineering, warranty structure.<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-group has-brass-background-color has-background is-layout-constrained wp-block-group-is-layout-constrained\" style=\"box-shadow:var(--wp--preset--shadow--natural);background-image:linear-gradient(290deg,rgb(238,238,238) 46%,rgb(169,184,195) 100%);\">\n<p class=\"wp-block-paragraph\"><strong>RELATED READING<\/strong><\/p>\n\n\n\n<div class=\"wp-block-group is-vertical is-layout-flex wp-container-core-group-is-layout-4fc3f8e1 wp-block-group-is-layout-flex\">\n<p class=\"wp-block-paragraph\">For a broader understanding of curtain wall engineering, material selection and facade performance, explore the <a href=\"https:\/\/www.starveilfacade.com\/ar\/insights\/\">Starveil Facade Insights Hub<\/a>, where you can find practical guidance for different building envelope requirements. If you are specifying aluminium profiles, our guide to <a href=\"https:\/\/www.starveilfacade.com\/ar\/insights\/6061-vs-6063-aluminum\/\">6061 vs 6063 aluminum alloys<\/a> explains how alloy strength, extrusion characteristics and finish requirements affect mullions, brackets and structural connections. For glazing and thermal performance, read our guide to <a href=\"https:\/\/www.starveilfacade.com\/ar\/insights\/insulated-curtain-wall\/\">insulated curtain wall systems<\/a> to understand how thermal breaks, insulated glass units and warm-edge spacers work together. You can also explore our guide to <a href=\"https:\/\/www.starveilfacade.com\/ar\/insights\/curtain-wall-waterproofing\/\">\u0627\u0644\u0639\u0632\u0644 \u0627\u0644\u0645\u0627\u0626\u064a \u0644\u0644\u062c\u062f\u0631\u0627\u0646 \u0627\u0644\u0633\u062a\u0627\u0626\u0631\u064a\u0629<\/a> to learn how pressure equalisation, drainage paths, end dams and perimeter seals help protect the building envelope against water penetration.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-group insight-faq is-layout-flow wp-block-group-is-layout-flow\">\n<h2 id=\"section-9\" class=\"wp-block-heading\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\n\n\n\n<details id=\"faq-curtain-wall-factory-audit-foshan-01\" class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What are the main curtain wall system components?<\/summary>\n<p class=\"wp-block-paragraph\">Five: aluminium profiles, glass, sealants and gaskets, hardware and anchors, and the drainage design. They are engineered as one tested assembly with a shared load path and a shared warranty, which is what separates a system from a list of materials.<\/p>\n<\/details>\n\n\n\n<details id=\"faq-curtain-wall-factory-audit-foshan-02\" class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What are the main types of curtain wall systems?<\/summary>\n<p class=\"wp-block-paragraph\">By construction route: stick systems assembled on site, unitized cassettes glazed in the factory, and window wall spanning between floor slabs. By appearance: visible-frame, structurally glazed and point-supported. The route decision comes first, because it decides where the quality is made.<\/p>\n<\/details>\n\n\n\n<details id=\"faq-curtain-wall-factory-audit-foshan-03\" class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>How is a curtain wall system tested before production?<\/summary>\n<p class=\"wp-block-paragraph\">On a performance mock-up built from production materials, including the worst corner and an operable element. Air, water and structural tests run against recognised methods such as ASTM E331 and the CWCT standard, and failures at the rig are cheap compared with failures at floor 30.<\/p>\n<\/details>\n\n\n\n<details id=\"faq-curtain-wall-factory-audit-foshan-04\" class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What performance can a unitized curtain wall system reach?<\/summary>\n<p class=\"wp-block-paragraph\">On the delivered Foshan Tianyue tower, an 18,000 m\u00b2 40-storey unitized envelope, whole-building U-values held at 2.0 W\/(m\u00b2\u00b7K) for the curtain wall and 1.6 W\/(m\u00b2\u00b7K) for the hotel zones, with verified acoustics of Rw 35 to 45 dB, and design, fabrication and export supply closed in 32 weeks ex-works.<\/p>\n<\/details>\n\n\n\n<details id=\"faq-curtain-wall-factory-audit-foshan-05\" class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>How do we verify a supplier&#8217;s system before ordering?<\/summary>\n<p class=\"wp-block-paragraph\">Ask for the five elements in writing: section calculations and material certificates, glass build-up with calculated values, sealant movement class, anchor adjustment range, and the drainage drawing with test reports behind it. Then visit the plant or run a station-by-station video audit against that list.<\/p>\n<\/details>\n\n\n\n<details id=\"faq-curtain-wall-factory-audit-foshan-06\" class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Does a curtain wall system include installation?<\/summary>\n<p class=\"wp-block-paragraph\">The system supply includes the components, shop drawings, installation manual and technical support. Installation is a separate scope with its own warranty, carried out by your crew, a supervised local crew, or the supplier&#8217;s team where the contract allows. The two warranties should be written as separate instruments so responsibility is never ambiguous.<\/p>\n<\/details>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Learn the five key curtain wall components, material specifications, drainage design and selection steps for high-performance commercial building envelopes.<\/p>","protected":false},"author":2,"featured_media":1554,"template":"","insight_topic":[31],"class_list":["post-1440","insight","type-insight","status-publish","has-post-thumbnail","hentry","insight_topic-system-selection"],"_links":{"self":[{"href":"https:\/\/www.starveilfacade.com\/ar\/wp-json\/wp\/v2\/insight\/1440","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.starveilfacade.com\/ar\/wp-json\/wp\/v2\/insight"}],"about":[{"href":"https:\/\/www.starveilfacade.com\/ar\/wp-json\/wp\/v2\/types\/insight"}],"author":[{"embeddable":true,"href":"https:\/\/www.starveilfacade.com\/ar\/wp-json\/wp\/v2\/users\/2"}],"version-history":[{"count":2,"href":"https:\/\/www.starveilfacade.com\/ar\/wp-json\/wp\/v2\/insight\/1440\/revisions"}],"predecessor-version":[{"id":1445,"href":"https:\/\/www.starveilfacade.com\/ar\/wp-json\/wp\/v2\/insight\/1440\/revisions\/1445"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.starveilfacade.com\/ar\/wp-json\/wp\/v2\/media\/1554"}],"wp:attachment":[{"href":"https:\/\/www.starveilfacade.com\/ar\/wp-json\/wp\/v2\/media?parent=1440"}],"wp:term":[{"taxonomy":"insight_topic","embeddable":true,"href":"https:\/\/www.starveilfacade.com\/ar\/wp-json\/wp\/v2\/insight_topic?post=1440"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}