The checklist

Cluster 1 · Factory evidence

#QuestionWhat a passing answer looks like
1Do you extrude your own profiles or buy them?A named in-house extrusion line, or a named mill with certificates flowing into the same QA system
2Can I see the plant on one week’s notice?Yes, with a proposed route through the lines, not a “customer centre”
3Which production steps happen inside your fence?A list: extrusion, machining, glazing, cassette assembly, with subcontracted steps declared
4What is your annual envelope output?A number in square metres with the current year’s order book context
rugged tablet with a checklist interface on a facade factory workbench, on-screen text blurred and illegible

Cluster 2 · Engineering capability

#QuestionWhat a passing answer looks like
5Who owns the structural calculation?A named facade engineer with a stamp and a revision chain
6Show me a shop drawing set from a delivered project.Numbered, revisioned, approved drawings with markup history
7How do you take site geometry?A stated survey method and who owns the tolerance risk
8What do you simulate before fabricating?Thermal, acoustic and water performance against the project’s targets

Cluster 3 · Quality and testing

#QuestionWhat a passing answer looks like
9Is the quality system certified, and to what?ISO 9001 with a certificate number you can verify at iso.org
10What is the first-article procedure?Inspection, sign-off and hold point before production release
11Can I witness a test?Water penetration and structural tests scheduled at named gates
12How is fabrication photographed?Staged QA photography at declared stages, archived per project
open ring binders of mill certificates and test reports on a factory office desk, printed words out of focus

Cluster 4 · Logistics and export

#QuestionWhat a passing answer looks like
13Who writes the container loading plan?The factory does, in installation sequence, before the vessel sails
14How is the packing coded?One coding chain from drawings to crates to site responses
15What are your Incoterms, and why those?A reasoned answer tied to who controls freight and risk
16Which port do you ship from, and how often?A named port with current sailing frequency

Cluster 5 · Commercial terms

#QuestionWhat a passing answer looks like
17What exactly is in the quotation scope?Engineering, materials, fabrication, packing, supervision items listed line by line
18What triggers a variation?Written triggers, not verbal ones
19How is payment phased?Milestones tied to artefacts: approvals, first article, shipment
20Who holds the design liability?A named party, in writing, before the deposit

Cluster 6 · After delivery

#QuestionWhat a passing answer looks like
21What is the warranty structure?Separate instruments for supply and for installation scope
22How do replacements work?A documented panel-by-panel manual and replacement route
23What remote support do I get during erection?A response commitment with a stated answer time
24Can I talk to a past client?A reference contact for a project with published records

How to run the list without insulting anyone

Serious manufacturers welcome this list because it is the shortest conversation they can have with a serious buyer. Frame this facade supplier checklist as your procurement standard rather than an interrogation, and send it in writing before the first call. A list like this is simply the questions to ask curtain wall manufacturer candidates, written down once so every contender answers the same sheet. A supplier who answers nineteen questions well and says “we do not do that” on the remaining five has told you something more useful than a supplier who answers all twenty-four vaguely. The failures to walk away from are the ones that answer with adjectives instead of artefacts.

The artefact rule

Every question in a facade supplier checklist is really the same question in disguise: show me the record. A certificate number, a stamped drawing, a dated photograph, a named reference. This is the same discipline we describe in our delivery milestones guide, where every programme gate is confirmed by an artefact rather than a status call. A supplier who tracks artefacts in delivery will track them in quotation too, and the reverse also holds.

Where the checklist connects to the audit

Questions 1 to 4 of this facade supplier checklist are answerable in one day on the Starveil Facade factory floor. Our Foshan factory audit checklist walks the same ground in physical form. It shows which workstations to stand at, which records to ask for at each, and how to read a factory that is performing for you rather than working. On our own floor, the outgoing inspection measures 100% of key dimensions on every profile, applies AQL batch sampling under GB/T 2828.1, and sends six extrusions from each batch for laboratory testing against GB/T 5237 and GB/T 14846. A supplier with a working quality system will describe its version in equally specific terms. If the written answers to cluster 1 are sound, the visit confirms them. If they are vague, the visit is theatre.

Manufacturer or trading desk

Cluster 1 of a facade supplier checklist is where the distinction between a manufacturer and a trading company shows earliest, because a trading desk can forward an email but cannot walk you past an extrusion press. The distinction is not a verdict on quality; some trading structures deliver well. It is a verdict on who can answer questions 5 to 24 with their own records. Our comparison guide on trading companies versus manufacturers sets out the five-line test in full.

When to stop asking and start checking

A facade supplier checklist has a half-life. Once the shortlist is two suppliers and the answers are on paper, the next step is verification: a video walkthrough or an audit visit for cluster 1, a witnessed test for cluster 3, and a reference call for cluster 6. On the delivered 5,200 m² Botswana Sports Arena envelope, a curved-glazed landmark venue seated for 8,000 and fabricated in 28 weeks ex-works, the technical documentation package answered every question in clusters 3, 4 and 6 of this facade supplier checklist before the containers sailed, and the local contractor erected the envelope with their own crew under our supervising engineer. Everything beyond that point is negotiation, and negotiation goes better when both sides know the artefacts exist.

Send the list, then send the project

Send Starveil Facade this facade supplier checklist with your project line attached: building type, envelope area, city and target dates. You will get the twenty-four answers in writing with the supporting artefacts named, plus an indication of which answers change with your specific geometry.

ما يجب تذكّره

  • Every question in a facade supplier checklist is asking for an artefact; adjectives are not artefacts.
  • A supplier who admits gaps on five questions has told you more than one who fogs all twenty-four.
  • The written answers set the visit agenda; the visit should never be the first evidence.

RELATED READING

For a structured overview of the documents, test evidence and project responsibilities buyers should verify, visit our Certification & Compliance Hub. To understand how to assess a supplier’s actual production capacity, equipment and quality records, read our curtain wall factory audit guide. For a clearer picture of what an international facade supplier should deliver and which responsibilities remain with the local project team, explore our facade design and supply guide. You can also review our facade certification guide to distinguish meaningful product and performance evidence from certificates that do not establish project-specific compliance.

الأسئلة الشائعة

Which facade supplier checklist questions should I ask first?

Start with factory evidence: who extrudes the profiles, what happens inside the fence, and whether you can visit on short notice. Those answers shape how much the remaining twenty are worth.

How do I use a facade supplier checklist to verify quality claims?

Ask for the ISO 9001 certificate number, the first-article procedure, and a witnessed test invitation. A manufacturer with staged QA photography and declared test gates will offer all three unprompted.

Is a bigger factory always a better choice?

No. Output matters less than fit: a plant geared to 20,000 m² towers may not give a 400 m² shopfront the engineering attention it needs. Match the project scale to the factory’s current order book.

What documents should exist before I pay a deposit?

A quotation with line-item scope, written variation triggers, milestone payments tied to artefacts, and a named holder of design liability. If any of the four is missing, the deposit is premature.

Should I appoint a third-party inspection agency before shipment?

For significant orders, yes. An SGS, BV or TÜV inspection at the factory before loading is normal export practice, and we host such inspections as a standard part of export orders. Give the agency the checklist clusters that matter most to your project, so the visit spends its time on evidence rather than introductions.

How many suppliers should receive a facade supplier checklist?

Three is a workable shortlist for a facade supplier checklist round: enough to compare answers, few enough to read them properly. Score the written answers first, then spend visits and test invitations on the two that remain. A supplier who answers in artefacts at this stage will report in artefacts during the programme.

عن الكاتب

Kael

Kael

I help overseas developers, contractors and design-build firms source complete facade packages from China — windows, doors and curtain wall systems with consolidated vendors, transparent QC and single-point project delivery.

لماذا تثق بي:

12+ years in building materials and facade engineering
مجالات الخبرة الأساسية: توريد نوافذ وأبواب الألمنيوم وأنظمة الجدران الستارية.
مشروع لصالح المشترين الذين يستوردون من الصين.4,000تقديم الدعم لأكثر من
جهة الاتصال الأولى للمشترين الراغبين في إجراء تدقيق للمصنع أو جولة افتراضية عبر الفيديو للتعرّف على مرافقه.