Learn six details and no supplier can bluff you
A curtain wall section detail is a slice through the wall that shows what a photograph never will: where the water goes, where the thermal break sits, and how much metal holds the glass. Six details do most of the auditing work: mullion, transom, head or parapet cap, sill, corner and movement joint. Read them in that order and you can interrogate any quotation. Starveil Facade issues these sections from its Foshan engineering desk with every system proposal, and the delivered 40-storey tower below was built from details signed before a single profile was cut.
A curtain wall section detail is a scaled drawing cut vertically or horizontally through the envelope, showing profiles, gaskets, glass engagement and drainage paths in true relationship. It is the document where performance claims become geometry: an equalised cavity, a break position, a bite depth. How to read curtain wall sections is a learnable routine, and this guide walks it detail by detail against the conventions of the CWCT Standard for systemised building envelopes. If a drawing cannot answer where the water goes, the detail is not finished.
The reading order, and what each detail must prove
| Detail | What it shows | What to verify |
|---|---|---|
| Mullion | Vertical member, fixings back to slab | Break position, section depth 135 to 180 mm, anchor adjustment |
| Transom | Horizontal member, glass saddles | Weep path and slope into the cavity |
| Head / parapet cap | Top closure and cap flashing | Overlap 75 to 100 mm, pressure-equalisation vent |
| Sill | Bottom closure, the water table | Upstand height, end dams, sill tray |
| Corner | Change of direction | Shared mullion or corner post, seal path continuity |
| Movement joint | Structural gap between zones | Nominal width and drift allowance, typically ±15 mm |
Treat the table as an inspection route rather than a checklist to initial. A curtain wall section detail that answers its question in one drawing earns trust; one that needs three phone calls to explain does not. The dimensional chain these details assume, and the tolerances that keep that chain true, is covered in our facade fabrication tolerances guide.
Start at the mullion section
The curtain wall mullion section sets the depth of the whole wall, so start there. Read the outermost line first: outer face, pressure cap, gasket, glass, then the drained cavity, then the thermal break, then the inner face.

A typical commercial mullion runs 135 to 180 mm deep with a polyamide break of 24 to 34 mm; the deeper the section, the more glass weight and wind it carries.
Two marks separate a real mullion drawing from a decorative one. The break must interrupt every metal path from outside to inside, not just the main profile. And the anchor zone must show slotted holes with three-axis adjustment, because the slab it meets was poured to ±10 mm, not to zero. That is why the mullion read comes first in any curtain wall section detail review: if either mark is missing, the drawing is a picture, not an engineering document.
The transom and the water route
Transoms are where a curtain wall section detail tells the truth about drainage. Water that defeats the outer seal must fall to a transom, run to the mullion line and drain at the sill or through weeps, typically 5 to 8 mm holes, on a slope of 3 to 5 mm across the saddle. Follow the water in the drawing: in at the outer gasket, down the cavity, across the transom saddle, out at the weep. If the drawing lets water pool anywhere on that route, the wall will let water pool there too.
Head, cap and the pressure-equalised cavity
At the head and parapet cap the questions are overlap and venting. Cap flashings should overlap the vertical plane by 75 to 100 mm with a folded drip, not a raw cut edge. Behind the outer line, the cavity must be compartmented and vented so wind cannot drive water uphill; that is what pressure equalisation means in a curtain wall section detail, a vented zone that keeps the pressure behind the seal the same as the pressure in front of it. Without the vent, every gust is a pump.
The sill, where walls actually leak
Most water failures collect at the bottom of the wall, and that is where a curtain wall section detail is proven or broken. Four checks: a sill tray or upstand rising at least 15 mm above finished floor level; end dams that stop water running out of the tray into the structure; weeps positioned below the tray waterline, not above it; and any door threshold draining to the outside face rather than into the cavity. The curtain wall sill detail deserves the longest look of the six, because a sill that passes all four checks stays dry for thirty years and a sill that misses one leaks in the first storm season.
Corners and movement joints
Corners and movement joints are where repetition ends and engineering starts. At a corner, check whether one shared mullion turns the wall or two profiles meet on a purpose-made corner post, and whether the seal path continues around the change of direction without a field-made joint. At a movement joint, read the nominal width and the claimed accommodation: interstorey drift of ±15 mm is a common design allowance on mid-rise frames, and the cover plate, gasket and backer must all be sized to move that far without tearing. A curtain wall section detail that draws the joint closed, without its movement range, is telling you what the drawing wishes rather than what the building does.
From an approved curtain wall section detail to a delivered tower
The delivered Foshan Tianyue tower, an 18,000 m² 40-storey unitized envelope closed in 32 weeks ex-works, shows what this reading discipline buys at scale.

Starveil Facade signed the section set with the developer’s consultant before fabrication: a three-seal EPDM perimeter with compartmented drainage, brackets with three-axis adjustment, and whole-building U-values held at 2.0 W/(m²·K) for the curtain wall and 1.6 W/(m²·K) for the hotel zones. Every cassette was numbered against its section, so the panel installed on floor 34 matched the drawing approved on day one. How fast signed drawings turn into finished cassettes is quantified in our unitized panel production rates note, the wider system logic sits in our curtain wall system guide, and buyers on the import route can see how the drawing set travels with the goods in our cross-border facade workflow.
Send the worst corner, ask for the six
Send your elevation, the slab-to-slab dimensions, the exposure the wall faces, and the architectural intent you cannot negotiate away. Ask back for the six sections as a coordinated set: mullion, transom, head, sill, corner and movement joint, with each curtain wall section detail marked for drainage path, thermal break position and glass bite depth. The Starveil Facade engineering desk returns that set from the Foshan plant with calculations behind every line, and the full component scope for the unitized route can be checked on our unitized curtain wall product page. Concept-stage drawings are enough to start.
What to carry forward
- Six details, read in order: mullion, transom, head, sill, corner, movement joint.
- Every curtain wall section detail answers one question: where does the water go next?
- No continuous break, no credible U-value; check the metal path, not the brochure.
- A sill without a tray, end dams and correct weeps is a first-storm leak.
- Movement joints must be drawn at their travel limit, never shown closed.
Frequently asked questions
What is a curtain wall section detail?
A scaled slice through the envelope showing profiles, gaskets, glass engagement and drainage in true relationship. It is the document that turns performance claims into geometry, and the basis on which mock-ups are built and cassettes are fabricated.
How do you read curtain wall sections quickly?
Read any curtain wall section detail the same way: outside in, then top to bottom. Take the outer seal, the cavity, the break and the inner face at the mullion first, then follow the water from transom to weep at the sill. Six details, two questions each: where does the water go, and where is the metal interrupted.
Where does water drain in a curtain wall mullion section?
In at the outer gasket under wind pressure, down the compartmented cavity, across the sloped transom saddle to the mullion line, then out through weeps at or below the sill tray. On the delivered Foshan Tianyue tower, an 18,000 m² 40-storey unitized envelope closed in 32 weeks ex-works, a three-seal EPDM perimeter and compartmented drainage kept that route verifiable on every numbered cassette.
What should a curtain wall sill detail show?
A tray or upstand at least 15 mm above the floor line, end dams at every break in the tray, weeps below the waterline, and any door threshold draining to the outside face. If the drawing shows raw sealant where the tray should be, send it back.
Can a curtain wall section detail change after mock-up testing?
Yes, and that is partly what the mock-up is for: a failure at the rig is folded back into the sections before production release. What cannot happen is a silent change; every revision should be issued, dated and re-signed so the fabricated wall always matches an approved drawing.
Do the supplier or the installers own the section drawings?
The supplier engineers and issues them; the installer builds to them. On cross-border projects the drawing set, calculations and material certificates travel together as the handover package, so responsibility for the built wall is traced to one issued revision rather than argued from memory.
RELATED READING
For a broader understanding of facade engineering and system selection, visit the Starveil Facade homepage to explore its manufacturing capabilities, engineering services and completed projects. For more detailed technical guidance, read our curtain wall system guide to understand how profiles, glass, seals and drainage work together, explore the facade fabrication tolerances guide to learn how dimensional accuracy and bracket adjustment affect installation, and see our unitized panel production rates guide to understand how approved drawings, factory assembly and delivery sequencing influence project schedules. These resources connect curtain wall section detailing with the wider requirements of system design, manufacturing quality and project delivery.